logo

Are you need IT Support Engineer? Free Consultant

Bathing at Vieure

Vieure Natural Swimming Area

Vieure, France


Client
CCBB

Total construction value
1,400,000 €

Year

Ready for Summer 2026

Personnel involved
Inland Waterway Expert: Alcyon Concept
Certification Body: Veritas
Engineering: SPISEA
Construction: Nova Nautic


Expertise and sector

Link to expertise page

Project

Open-water swimming basin (25 m x 10 m) without artificial bottom, secured along the perimeter
Shallow wading pool (5 m x 5 m) with controlled bottom
Continuous natural water renewal from the lake every 15 minutes, ensuring high water quality without chemical treatment
Multi-use reception and event area, with the closed paddling pool adapted into a stage
Coexisting with surrounding uses such as recreational fishing
Controlled access via gated entry
Flow regulation : real-time user monitoring through 3D camera systems

Expertise

  • Designing and implementing the floating platform and anchoring system
  • Managing the superstructure – floating platform interface
  • Determining load requirements and approving the stability documentation
  • Managing the overall project: managing costs, quality, deadlines, and planning

Operations – Swimming site organization

Access Management: Capacity for 299 people simultaneously
Open for 12 weeks during the summer
Water renewal system: SPISEA technology enabling shared use across all seasons
Year round opening : SPISEA technology enabling shared use across all seasons

Gallery