Grenelle natural pool
Paris, France
Client
City of Paris
Total construction value
3 000 000 €
Year
Ready for summer 2025
Personnel involved
Architect : Matter Studio
Naval Architect : YC Design Studio
Enginneers : SPISEA
Construction : Nova Nautic
Expertise and sector
Project
Polyester shell with variable depth ranging from 1.5 to 2 ft
Non-slip access steps ensuring safe and easy water entry
Integrated seating platforms with a 16” freeboard
17 ft-wide access stairway providing generous and intuitive access to the water
Fully accessible design compliant with ADA standards
Expertise
- Designing and implementing the floating platform and anchoring system
- Managing the superstructure – floating platform interface
- Determining load requirements and approving the stability documentation
- Managing the overall project: managing costs, quality, deadlines, and planning
Operations – Swimming site organization
Capacity : 250 people
Lifeguards : 5 on duty
ADA compliant : a bathing pathway specially designed for assisted users
Two distincts spaces: 1 secured pool for kids, 1 open area for adults
Gallery













